CRJ-100/-200 Airframe Maintenance Cost Analysis, Issue 52 Jun/Jul 2007
Issue 52 Jun/Jul 2007
The CRJ-100/-200 has a complex maintenance programme. The aircraft has three A check task groups and three C check task groups, all with different basic intervals. This makes check planning complex, with the result that tasks are performed early and checks are uneven in size.