CRJ-100/-200 Airframe Maintenance Cost Analysis, Issue 52 Jun/Jul 2007

Issue 52 Jun/Jul 2007

The CRJ-100/-200 has a complex maintenance programme. The aircraft has three A check task groups and three C check task groups, all with different basic intervals. This makes check planning complex, with the result that tasks are performed early and checks are uneven in size.

 

This article can only be downloaded by subscribed users.

Login Subscribe