737NG long-term base maintenance assessment, Issue 108 Oct/Nov 2016

Issue 108 Oct/Nov 2016

The global 737NG fleet is spread across the first and second base check cycles. The fleet age ranges from new to 20 years old. The maintenance patterns and programmes vary with operators’ rates if utilisation and FH:FC ratios. The implications of these on the 737NG’s long-term base maintenance are explored.

This article can only be downloaded by subscribed users.

Login Subscribe