CF6-50 maintenance cost analysis, Issue 14 Nov/Dec 2000

Issue 14 Nov/Dec 2000

The CF6-50 will continue to operate in large numbers for another 20 years.
The engine has to be managed carefully, but can contribute to reasonable
total maintenance costs of the aircraft it powers. The CF6-50’s costs are on
a par with those of the JT9D.

This article can only be downloaded by subscribed users.

Login Subscribe