CFM56-7B maintenance management & shop visit inputs & reserves, Issue 134 Feb/Mar 2021

Issue 134 Feb/Mar 2021

The CFM56-7B has now been built to three production standards. The engine has demonstrated long-on-wing durability, and this results in long shop visit removal intervals. Potential shop visit patterns, shop visit inputs and costs, and resulting maintenance reserves are examined.

This article can only be downloaded by subscribed users.

Login Subscribe