Analysing the 737NG’s first base checks, Issue 46 Jun/Jul 2006

Issue 46 Jun/Jul 2006

The oldest 737NGs have completed their first base maintenance check
cycles. Analysis of the maintenance requirements and inputs reveals that
Boeing has achieved its objective of providing the aircraft with a
maintenance cost advantage over the 737 Classics.

This article can only be downloaded by subscribed users.

Login Subscribe